Skip to main content

FAQ - Building & Zoning

Zoning FAQs

  • If you are building any structure on your property or adding on to any existing structure you need a zoning permit.
  • You must have a Zoning Permit before you can get a building permit in all zoned townships, they can be applied for at the same time.
  • If you intend to use your property for a use other than the current use, you need to have approval from the Zoning Department.
  • A drawing of your property indicating the following:
    • Name and address of property
    • Lot dimensions
    • Structure dimensions
    • Location of structure and distance from property lines
    • Driveway, septic and well locations
    • Any body of water
    • Any easement
  • A Zoning Violation is when a property does not comply with the Clinton County Zoning Resolution, which governs land uses.

Steps once a violation is identified, either by a citizen complaint or observed by a Zoning Inspector.

  • Notice of Violation is mailed to the property owner by certified mail.  
  • The owner will have 30 days from receipt of letter to comply.
  • If the owner has circumstances that require more than 30 days to comply, the Zoning Department will work with the owner.
  • When there is no attempt to comply from the owner, the matter will be referred to legal counsel per CCZR Section 10.09 (B) (3) Enforcement, Violations, Penalties - Non-Compliance with Order.
  • It is not possible to identify by list every violation in the Clinton County Zoning Resolution. If you have been notified of a violation, it is because it is not identified as a permitted use in your specific zoning district. For example:  a shipping container is not identified as permitted in Accessory / Temporary Uses and therefore is not seen as a permitted accessory structure. 

BUILDING FAQs

  • If you are doing any of the following you need a building permit:
    • Any new structure (house or accessory)
    • Any addition or structural changes
    • Deck
    • Electric installations
    • Fireplace or wood stove
    • Pool
    • Remodels
    • Signs
    • Not a complete list, please call the office if not listed to verify
  • Upload a PDF to your online permit or bring to the office to be scanned
  • Any pole barn that has trusses 36' or larger, the building plans must be approved and stamped by an engineer for the plan review.

The following is needed when you apply for a permit.

  • Site plan of the property.
    • Location of new structure
    • Setbacks - number of feet between each building and from new building to property lines
    • Property owner name, address and Parcel ID if known
    • Location of septic and/or well
  • Building plans.
  • Septic approval (if applicable).

PERMIT PROCESS FAQs

  • Apply online in the Permit Portal or download the PDF application. 
  • Please use your Permit Number any time you call the office.
  • Online at https://clintonoh.portal.iworq.net/portalhome/clintonoh
    • Pending – waiting on department approvals
    • Awaiting Payment – reviews approved and fees added
    • Open – ready to start project and waiting on inspections
    • Closed – after final approved inspection
  • Or you may call or email our office.

General Information
Phone Numbers
937-382-3335
Emergencies: Dial 911
Location
111 S Nelson Ave
Suite # 8
Wilmington,
OH
45177

Mon-Fri
7:30 AM - 4:00 PM